top of page

TBD

Budget

TBD

Date

TBD

Project Size

GC

Role

Project Overview

Building a Better Training Environment for Future Pilots

KGM Builders is partnering with Thrust Flight ⧉ to enhance their aviation training facilities through a phased renovation approach, ensuring continuous operations while expanding instructional capabilities. Phase 1 focused on creating a dedicated classroom within the existing hangar — complete with new walls, a suspended ACT ceiling, temporary power, a 3-ton mini-split HVAC system, and a fresh entry point — enabling uninterrupted student learning during construction. Phase 2 introduces a full 6,000 SF interior transformation of the building attached to the hangar. The upgraded layout will feature new classrooms, ride-check rooms, offices, a mechanic shop, a flight simulation room, and an inviting common area for students and faculty. Exterior enhancements will further support campus growth, including improved entry parking and a newly developed west-side lot for increased traffic and enrollment capacity.

Challenges Encountered: 

Weather-related water intrusion created unforeseen moisture issues along the exterior envelope. Our team quickly identified and resolved problem areas by removing damaged panels, installing new waterproof barriers, and replacing metal siding where required. We also executed extensive saw-cutting to integrate new underground sewer lines into the existing slab — all while keeping safety and ongoing school operations top of mind.

Improvement Initiatives:  

Upcoming upgrades include sealing roof penetrations and installing a 100-foot rain gutter system along the northwest side to prevent future water intrusion and redirect drainage away from the new parking lot expansion. These improvements — combined with interior modernization — will provide a more functional, comfortable, and high-performance learning environment for staff, future pilots, and aircraft mechanics.

kgm-builders-thrust-flight-hightlights.jpg
Project Highlights

Progress That Fuels Ambition

This renovation elevates Thrust Flight’s ability to train the next generation of aviation professionals with improved classroom environments, advanced simulation and testing spaces, and a more welcoming campus layout. The project ensures operational continuity while delivering long-term value through future-focused improvements.

With enhanced infrastructure, better protection from weather, increased parking capacity, and purpose-built instructional rooms, students and faculty will benefit from a campus designed to support growth — on the ground and in the air.

Project Gallery

A Look Inside the Transformation

Let’s Build It Together

Contact KGM Builders today to start your construction project. From planning to completion, our team is here to deliver quality and expertise.

Building Beyond Expectations

Transforming Thrust Flight’s training campus with phased upgrades including new classrooms, specialized labs, flight simulation, and expanded parking.

Thrust Flight School

kgm-builders-thrust-flight-hero.jpg
Transforming Thrust Flight’s training campus with phased upgrades including new classrooms, specialized labs, flight simulation, and expanded parking.

Thrust Flight School

Building The Valley

It’s the people behind the build that make the difference. From early planning to final walkthrough, we bring craftsmanship, experience, and accountability to every project. We’re proud to help shape the Valley one job at a time.

bottom of page